Quality Assurance
Rigorous quality control at every stage — from raw materials to final shipment
6-Stage Quality Control Process
IQC — Incoming Quality Control
Raw material inspection and verification. All plastic pellets, electronic components and packaging materials tested against specifications before entering production.
IPQC — In-Process Quality Control
Dedicated QC inspectors patrol assembly lines. Flash/burr inspection on injection parts, paint accuracy checks, adhesive bond strength — all monitored in real-time.
FQC — Final Quality Control
100% appearance and function inspection on every finished product. Color matching, assembly completeness, mechanism testing — nothing ships without full verification.
OQC — Outgoing Quality Control
Packaging integrity verification. Correct labels, barcodes, quantity counts and protective packaging confirmed before sealing.
Lab Testing — ISTA Grade
In-house vibration tester and drop test equipment simulate real transport conditions. Every batch verified to withstand truck, rail and ocean freight.
Shipping Verification
Final packaging protection audit. Carton crush test, stacking verification and moisture protection checks before containers are sealed.
Certifications & Standards
Comprehensive compliance across international toy safety and manufacturing standards
ISO 9001:2015
Quality Management System
ICTI Ethical Toy Program
Worker welfare, health and safety
BSCI Social Compliance
Supply chain social responsibility
EN 71
EU toy safety — mechanical, flammability, chemical
ASTM F963
US toy safety standard
GB 6675
China national toy safety standard
ISTA Transport Testing
International transport packaging verification
Disney FAMA
Disney Factory Audit Management
In-House Testing Laboratory
Our dedicated testing lab ensures every batch meets international transport and safety standards before shipment. Key capabilities include ISTA-grade transportation vibration simulation, standardized drop testing from 1.2m height, pull-force testing for small parts, and torque testing for mechanical components.
- 1Transportation vibration simulation (ISTA)
- 2Drop test — 1.2m standard height
- 3Pull-force test for small parts safety
- 4Torque test for mechanical joints


We Welcome Factory Audits
Our facilities, documentation and processes are maintained in audit-ready condition at all times. We regularly host inspections from major IP licensors and third-party auditors.
- Disney FAMA Audit
- ICTI Ethical Toy Program
- BSCI Social Compliance
- ISO 9001 Surveillance
- Client-Specific Factory Inspections